Professional brise soleil across Stockport and Greater Manchester — free surveys and fixed written quotations.
Our facade engineers cover Stockport and every surrounding Greater Manchester town, delivering brise soleil for main contractors, architects, landlords and building owners. Survey to certification, handled by one team.
Brise soleil provides passive solar shading, cutting summer heat gain through glazed facades and reducing cooling loads — often a planning or BREEAM requirement on heavily glazed elevations.
We install horizontal projecting systems above glazing, vertical fins on east/west elevations, and full louvre screens, all in PPC aluminium matched to the curtain walling.
Brackets fix back through the curtain wall mullions to structure, so shading is engineered with the facade, not bolted on afterwards.
We have delivered glazing and facade projects throughout Greater Manchester for years. In and around Stockport we work on offices, retail units, schools, industrial buildings and residential developments — each with full site-specific design and certification.
All systems are specified to meet current Part L thermal requirements as a minimum.
Regional teams across the UK mean local service with national capability.
Every completed installation is handed over with warranties, test records and compliance documentation.
Every project starts with a free, no-obligation site survey and a fixed written quotation — no estimates that drift.
Main contractors, architects, developers, landlords, facilities managers and owner-occupiers — from single screens to multi-elevation facade packages across Greater Manchester.
We provide the drawings, specifications and certification your architect or building control body needs, and advise on planning-sensitive frontages including conservation areas in Greater Manchester.
Yes. Every system we install is thermally broken and specified to meet current Building Regulations Part L requirements as a minimum, with upgraded glass options available.
A single glazed screen or shopfront is typically installed in days; full elevations run from two to eight weeks depending on size, height and access. We confirm a programme with your fixed quotation.
Free site survey, fixed written quotation, no obligation. Call, message or send the form below.
Tell us about your project and we'll arrange a free site survey. We respond to every enquiry within one working day.