Professional stick curtain walling across Oswestry and Shropshire — free surveys and fixed written quotations.
Our facade engineers cover Oswestry and every surrounding Shropshire town, delivering stick curtain walling for main contractors, architects, landlords and building owners. Survey to certification, handled by one team.
Stick curtain walling is assembled piece by piece on site — mullions first, then transoms, then glazing and capping. It is the most flexible and cost-effective curtain wall method for low and mid-rise buildings, and the system we install most often on schools, offices and retail schemes.
Because the frame is built in place, stick systems adapt easily to site tolerances and awkward interfaces with existing structure — a major advantage on refurbishment projects.
We install stick systems from all the major UK system houses, with full structural calculations, thermal modelling and NBS-compliant specification support.
Because we cover the whole of Shropshire from regional teams, Oswestry projects get genuine local service: quick site visits, local supply chain familiarity and installers who are back on patch the next day if you need them.
All systems are specified to meet current Part L thermal requirements as a minimum.
Installation follows Centre for Window and Cladding Technology standards with documented quality checks at every stage.
Every completed installation is handed over with warranties, test records and compliance documentation.
Phased programmes, temporary weathering and out-of-hours working keep buildings in use during facade work.
Yes. Wind loading, dead load and deflection calculations are produced for every curtain walling project, and thermal modelling where the specification requires it.
In most cases yes. Aluminium framing is powder coated to any RAL or BS colour, and we can usually source compatible profiles or fabricate matching sections for repairs and extensions to existing facades.
Installations carry our workmanship warranty alongside manufacturer system and coating warranties — typically 10 to 25 years depending on the system, with all documentation provided at handover.
We provide the drawings, specifications and certification your architect or building control body needs, and advise on planning-sensitive frontages including conservation areas in Shropshire.
Free site survey, fixed written quotation, no obligation. Call, message or send the form below.
Tell us about your project and we'll arrange a free site survey. We respond to every enquiry within one working day.