Professional stick curtain walling across Slough and Berkshire — free surveys and fixed written quotations.
Our facade engineers cover Slough and every surrounding Berkshire town, delivering stick curtain walling for main contractors, architects, landlords and building owners. Survey to certification, handled by one team.
Stick curtain walling is assembled piece by piece on site — mullions first, then transoms, then glazing and capping. It is the most flexible and cost-effective curtain wall method for low and mid-rise buildings, and the system we install most often on schools, offices and retail schemes.
Because the frame is built in place, stick systems adapt easily to site tolerances and awkward interfaces with existing structure — a major advantage on refurbishment projects.
We install stick systems from all the major UK system houses, with full structural calculations, thermal modelling and NBS-compliant specification support.
Because we cover the whole of Berkshire from regional teams, Slough projects get genuine local service: quick site visits, local supply chain familiarity and installers who are back on patch the next day if you need them.
Every project starts with a free, no-obligation site survey and a fixed written quotation — no estimates that drift.
Every completed installation is handed over with warranties, test records and compliance documentation.
Regional teams across the UK mean local service with national capability.
Design, fabrication coordination, installation and sealing handled by one team — no interface disputes.
Installations carry our workmanship warranty alongside manufacturer system and coating warranties — typically 10 to 25 years depending on the system, with all documentation provided at handover.
Yes. Wind loading, dead load and deflection calculations are produced for every curtain walling project, and thermal modelling where the specification requires it.
Yes. Slough sits within our core Berkshire coverage area, and our regional teams handle projects across the county and nationwide.
Yes. Every system we install is thermally broken and specified to meet current Building Regulations Part L requirements as a minimum, with upgraded glass options available.
Free site survey, fixed written quotation, no obligation. Call, message or send the form below.
Tell us about your project and we'll arrange a free site survey. We respond to every enquiry within one working day.