Professional stick curtain walling across Stratford-upon-Avon and Warwickshire — free surveys and fixed written quotations.
Need stick curtain walling in Stratford-upon-Avon? We install thermally efficient, fully certified curtain walling systems across Warwickshire, backed by manufacturer warranties and CWCT-compliant installation records.
Stick curtain walling is assembled piece by piece on site — mullions first, then transoms, then glazing and capping. It is the most flexible and cost-effective curtain wall method for low and mid-rise buildings, and the system we install most often on schools, offices and retail schemes.
Because the frame is built in place, stick systems adapt easily to site tolerances and awkward interfaces with existing structure — a major advantage on refurbishment projects.
We install stick systems from all the major UK system houses, with full structural calculations, thermal modelling and NBS-compliant specification support.
From Stratford-upon-Avon town centre commercial frontages to business park offices on the edge of Warwickshire, our teams handle the full range of curtain walling work with the same survey-first, certify-everything approach.
Every project starts with a free, no-obligation site survey and a fixed written quotation — no estimates that drift.
Installation follows Centre for Window and Cladding Technology standards with documented quality checks at every stage.
All systems are specified to meet current Part L thermal requirements as a minimum.
Regional teams across the UK mean local service with national capability.
Yes. Wind loading, dead load and deflection calculations are produced for every curtain walling project, and thermal modelling where the specification requires it.
Yes. Every system we install is thermally broken and specified to meet current Building Regulations Part L requirements as a minimum, with upgraded glass options available.
We provide the drawings, specifications and certification your architect or building control body needs, and advise on planning-sensitive frontages including conservation areas in Warwickshire.
A single glazed screen or shopfront is typically installed in days; full elevations run from two to eight weeks depending on size, height and access. We confirm a programme with your fixed quotation.
Free site survey, fixed written quotation, no obligation. Call, message or send the form below.
Tell us about your project and we'll arrange a free site survey. We respond to every enquiry within one working day.